[1] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[2] |
MA Dongli, ZHAI Chaojiao, ZHANG Guozhi, TU Xiaoguang, LI Chao.
Setting Spacing Optimizing of Deformation Joints in Cast-in-situ Concrete Utility Tunnel
[J]. Tunnel Construction, 2019, 39(S2): 301-307.
|
[3] |
HAN Xiaoliang.
Case Study of Breaking off of Outer Sealing Ring of TBM Main Bearing
[J]. Tunnel Construction, 2019, 39(S2): 393-397.
|
[4] |
WU Mengjun, CAO Peng.
Study on Key Parameters of Small Spacing Tunnels in Pebble Layer
[J]. Tunnel Construction, 2019, 39(S1): 38-44.
|
[5] |
SONG Tiantian, LI Hongbo, CHEN Gang.
Problems and Countermeasures for Doubleshield TBM Applied in Shenzhen Metro
[J]. Tunnel Construction, 2019, 39(6): 998-1004.
|
[6] |
KONG Shaobo.
Design and Optimization for Cutterhead of an Extralarge Diameter Slurry Shield Boring in Submarine Complex Strata
[J]. Tunnel Construction, 2019, 39(6): 1030-1037.
|
[7] |
LIU Yunjun, LI Huayun, HUANG Dan.
Laws of Building Settlement Caused by Single Shield TBM Tunnel Construction in Composite Ground
[J]. Tunnel Construction, 2019, 39(4): 594-600.
|
[8] |
HU Jingjun, DOU Xiaotian, LI Zhijun, WANG Jinbo, ZHAO Liyong, LI Yongqiang.
Boring Attitude Control Technology for Shallowcovered and Smallspacing Rectangular Pipe Jacking
[J]. Tunnel Construction, 2019, 39(3): 465-472.
|
[9] |
HAN Zhanbo, DOU Xiaotian, CAO Weiming, WANG Jinbo, ZHAO Liyong, ZHENG Lijun.
Control Technology for Surface Deformation Induced by Construction of Shallowcovered and Smallspacing Rectangular Pipe Jacking
[J]. Tunnel Construction, 2019, 39(3): 496-503.
|
[10] |
GENG Jianyi, LIANG Zhihui, YANG Xin′an, WANG Bin.
[J]. Tunnel Construction, 2019, 39(12): 2000-.
|
[11] |
LI Peng, LI Yang, GAO Yi, YU Shaohui, LI Yingfei.
Analysis and Research on Surface Deformation Law of Pipe Jacking Tunnel Constructed by Cut and Convert Method
[J]. Tunnel Construction, 2019, 39(11): 1838-1847.
|
[12] |
HE Chao, ZHANG Peng, MA Baosong.
Calculation and Analysis of Pipe Jacking Spacing for Piperoof Project of Gongbei Tunnel
[J]. Tunnel Construction, 2019, 39(1): 94-101.
|
[13] |
ZHAO Shumin.
Application of Quantitative Theory Ⅲ and Limit Learning Machine to Analysis of Influencing Factors for Smallspacing Tunnel Deformation
[J]. Tunnel Construction, 2018, 38(9): 1456-1462.
|
[14] |
ZHOU Huagui, WANG Li.
Study of Plan, Crosssectional and Longitudinal Profile Design Schemes for Sea Water Section of Su′ai Tunnel in Shantou
[J]. Tunnel Construction, 2018, 38(7): 1189-1195.
|
[15] |
CHEN Xuwen, HUANG Lei, ZOU Yilun.
Rapid Construction Technology of Flexible Support for Rockburst Tunnel
[J]. Tunnel Construction, 2018, 38(7): 1212-1219.
|